{"id":3252,"date":"2025-01-22T10:18:54","date_gmt":"2025-01-22T10:18:54","guid":{"rendered":"https:\/\/ipasumitev.lv\/?p=3252"},"modified":"2025-02-14T14:40:21","modified_gmt":"2025-02-14T14:40:21","slug":"jurmalas-dome-atliek-nin-likmes-paaugstinasanu-ekspluatacija-nenodotam-ekam","status":"publish","type":"post","link":"https:\/\/ipasumitev.lv\/en\/jurmalas-dome-atliek-nin-likmes-paaugstinasanu-ekspluatacija-nenodotam-ekam\/","title":{"rendered":"J\u016brmala City Council postpones the increase of the VAT rate for buildings not put into operation"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"3252\" class=\"elementor elementor-3252\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-32342acd elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"32342acd\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-1b37cd6f\" data-id=\"1b37cd6f\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-136fde7d elementor-widget elementor-widget-text-editor\" data-id=\"136fde7d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\n<div class=\"wp-block-media-text is-stacked-on-mobile\">\n<figure class=\"wp-block-media-text__media\"><img decoding=\"async\" class=\"wp-image-3254 size-full\" src=\"https:\/\/ipasumitev.lv\/wp-content\/uploads\/2025\/02\/image-1.png\" alt=\"\" \/><\/figure>\n<div class=\"wp-block-media-text__content\">\n<p>J\u016brmala City Council has planned to apply the increased 3% real estate tax (REIT) rate for buildings that have exceeded the maximum duration of construction works and have not been put into operation from 1 January 2026 instead of 1 January 2024, as it was originally planned, LETA was informed.<\/p>\n\n<p>The municipality explains that this decision was taken in response to the applications of the residents, the general economic situation in the country, including the sharp increase in EURIBOR rates, as well as problems with the timely execution of cadastral survey orders by the State Land Service.<\/p>\n<\/div>\n<\/div>\n\n<p>From 1 January 2026, an increased rate of 3% will be applied to buildings not put into operation on time.<\/p>\n\n<p>Therefore, the procedure for granting VAT on buildings not put into operation, as well as tax incentives, will remain unchanged in J\u016brmala in 2024.<\/p>\n\n<p>Given the relatively time-consuming process of completing the construction documentation, the municipality encourages residents to take advantage of this transitional period until 1 January 2026 and not to postpone the commissioning of the buildings until the last moment.<br \/><br \/>Read the full article\u00a0<a href=\"https:\/\/www.db.lv\/zinas\/jurmalas-dome-atliek-nin-likmes-paaugstinasanu-ekspluatacija-nenodotam-ekam-514266\" rel=\"noopener\">https:\/\/www.db.lv\/zinas\/jurmalas-dome-atliek-nin-likmes-paaugstinasanu-ekspluatacija-nenodotam-ekam-514266<\/a><\/p>\n\n<p>\u00a0<\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>J\u016brmalas dome ir paredz\u0113jusi paaugstin\u0101to 3% nekustam\u0101 \u012bpa\u0161uma nodok\u013ca (N\u012aN) likmi \u0113k\u0101m, kur\u0101m p\u0101rsniegts maksim\u0101lais b\u016bvdarbu veik\u0161anas ilgums un kuras nav nodotas ekspluat\u0101cij\u0101, piem\u0113rot no 2026.gada 1.janv\u0101ra, nevis 2024.gada 1.janv\u0101ra, k\u0101 tas bija pl\u0101nots s\u0101kotn\u0113ji, a\u0123ent\u016bra LETA uzzin\u0101ja pa\u0161vald\u012bb\u0101. Pa\u0161vald\u012bb\u0101 skaidro, ka \u0161\u0101ds l\u0113mums pie\u0146emts, rea\u0123\u0113jot uz iedz\u012bvot\u0101ju iesniegumiem, visp\u0101r\u0113jo ekonomisko situ\u0101ciju valst\u012b, tostarp straujo [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3252","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/ipasumitev.lv\/en\/wp-json\/wp\/v2\/posts\/3252","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ipasumitev.lv\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ipasumitev.lv\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ipasumitev.lv\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/ipasumitev.lv\/en\/wp-json\/wp\/v2\/comments?post=3252"}],"version-history":[{"count":4,"href":"https:\/\/ipasumitev.lv\/en\/wp-json\/wp\/v2\/posts\/3252\/revisions"}],"predecessor-version":[{"id":3459,"href":"https:\/\/ipasumitev.lv\/en\/wp-json\/wp\/v2\/posts\/3252\/revisions\/3459"}],"wp:attachment":[{"href":"https:\/\/ipasumitev.lv\/en\/wp-json\/wp\/v2\/media?parent=3252"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ipasumitev.lv\/en\/wp-json\/wp\/v2\/categories?post=3252"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ipasumitev.lv\/en\/wp-json\/wp\/v2\/tags?post=3252"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}